The agreement includes:
- Allowing our members who are in
the Oversubscribed and Non-Surplus Category to receive the Enhanced May
2010 EIPP offer and leave the Company.
- Company will announce Special
Postings for all vacancies created by these employees leaving the
Company with the exception of three titles
(Watch Engineer, Special Representative and Construction Coordinator).
- The Special Postings will be
offered to the Remaining Surplus employees.
- Special Representative title –
Company will post twenty-four (24) Special
Postings for the Special Representative title.
- Construction Coordinator – The
Company will train 25 Administrative Assistants to become Construction
Coordinators. The agreement identifies the 25 Administrative Assistants
in the Upstate area.
- Company will post 140 SPVs for Field Tech (FT) for the Western, Central, Northeast, and Mid-State Area.
Locations and numbers can change but the total number remains 140.
- If
the140 FT openings are not filled internally, the Company will go to
the Street. If the Company is having trouble finding candidates to fill
these positions by November 20th, they will notify the Union so that we
can refer candidates. The Union will continue to refer candidates until
all vacancies are filled.
- Any
employee who is part of the remaining surplus group who fills one of
the 140 FT positions and if a home move is required will receive a
relocation allowance of $24,000.
- All other employees will fill
one of these positions and a home move is required will receive a
relocation allowance of $8,000.
- During
October 1, 2010 and December 31, 2010 VNY and VNE will not discipline
any Representative/Service Representative in the CSSC for failing to
adhere to the Sales Process Standards.
- Empire City Subway will post 4 SPVs for Plant Inspector in the Bronx and will
terminate (4) contracts performing Plant Inspector duties in the Bronx.
- The
Union will withdraw all grievances that it filed in connection to the
temporary transfers of Field Technicians to Upstate that occurred prior
to this agreement. In addition, the Union will not file any new
grievances relating to any Field Technicians on a temporary transfer
from LI to Upstate.
- If
the Company should have any FT from Tracey Edward’s organization or any
other organization involuntarily transferred to Tracey Edward’s Upstate
organization during the period of November 20, 2010 thru March 31,
2011, the Union may reinstate all grievances.
- In addition, if the company
needs to involuntarily transfer (except for an emergency) any Field
Technician from Tracey Edward’s organization
in Long Island or from any other organization to Tracey’s
Edward’s organization upstate it will meet with the Union to discuss
these transfers.
- We extended the No layoff
agreement to all employees to May 1, 2011.
- Any dispute regarding this
agreement can be grieved and arbitrated.
|